My progress over the weekend then went like this:
By the end of Saturday, I had got this far. The Minster and Lendal Tower were in place, as well as all the trees, bits of ground and other 'background' elements.
I spent more time on it on Sunday. By lunchtime I had the red building done and during the afternoon added the little yellow building with the tower. By teatime I was auditioning different fabrics for the river and opted for the green that I dyed at a recent workshop.
The arches on the left and bridge on the right were then followed by dragons heads and a tail. These are going to be dragon boats racing along the river. And that is how it still looks, further posts will follow when I find time to finish the appliqué (there will be waves on the river).
Looks intrguing - looking forward to seeing how it progresses
ReplyDeleteI think that it has turned out really well Karen. It is great to see your design turn into a really nice piece.
ReplyDelete